Originally from ticket #297.
Hi
I have two columns in my sprint backlog, "Todo" and "In progress" where the later has AutoAssign set to true in configuration XML.
I have two work items in "Todo". The first is not assigned, the second is assigned to someone else.
Whe I move the first (not assigned) work item to "In progress" column, the work item is assigned to me.
Then I move the second one to the "In progress" column and the work item is not assigned to me.
Is this expected behaviour?
I'm using ver. 4.2.2.0.
Thank you,
Zvonko
2 Comments